Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Tom Saunders
|
|
|
This already passed the exterior portion but the homeowner was not home to allow access inside. They will need to run kids to school and would appreciate a heads up with an ETA. Thank you. Phone #: ###-#### Inspection requested via web by BRS Permitting...labelling, disconnect, and OCPD ok
|
Final | 4/23/2018 | 4/27/2018 | 4/27/2018 | P | CANC |
Mark Moncarr
|
|
|
Also needs to pass rough electrical inspection. We will have tech (Justin) there for rough/final. Phone #: ###-#### x208 Inspection requested via web by BRS Permitting Contractor brought components. Everything was UL listed. Customer was not home to gain access to garage.
|
Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | FAIL |
Tom Saunders
|
|
|
karrigan Phone #: ###-####...no access to roof, Boise City requires rough inspection for UL verification, contractor must be onsite for future inspections
|