Final | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Eric Story
|
|
|
Final inspection please. Have a bless weekend! Phone #: ###-#### Inspection requested via web by Kyle Lott Final ok card signed
|
Final | 8/8/2018 | 8/9/2018 | 8/8/2018 | A | CANC |
Rock A. Hudson
|
|
|
Final inspection please. Have a bless day! Phone #: ###-#### >> Inspection requested via web by Kyle Lott Inspection cancelled from web by: Kyle Lott
|
Electrical Rough-In | 6/14/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Mark Moncarr
|
|
|
Rough in Entry Soffet please. Thank you. Phone #: ###-#### Inspection requested via web by Kyle Lott Ok cover entry soffit.
|
Electrical Rough-In | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Rock A. Hudson
|
|
|
Lighting assembly inspection please. Thank you. Have a bless Wednesday! Phone #: ###-#### Inspection requested via web by Kyle Lott 2 clouds will have access panels for junction boxes located above, took pictures. Ceiling rough in ok cover
|
Electrical Rough-In | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Ceiling inspection please. Have a bless week! Phone #: ###-#### Inspection requested via web by Kyle Lott 110.14- Splice points shall be accessible. 2 boxes located above clouds. 300.4- MC shall be secured 1 1/4" from framing surface. 314.23- Boxes hanging out of cloud shall be securely mounted to structure.
|
Electrical Rough-In | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | CANC |
Rock A. Hudson
|
|
|
Ceiling inspection please. Have a bless week! Lott Electric INC Phone #: ###-#### >> Inspection requested via web by Kyle Lott Inspection cancelled from web by: Kyle Lott
|
Electrical Rough-In | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | PASS |
Rock A. Hudson
|
|
|
Wall cover please. Phone #: ###-#### Inspection requested via web by Kyle Lott Wall rough in ok cover
|
Electrical Rough-In | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Wall cover please Phone #: ###-#### Inspection requested via web by Kyle Lott 300.4- MC run thru bored holes that do not maintain 1 1/4" from framing surface shall be protected from damage. 300.4- MC shall not be secured with in 1 1/4" from faming surface. 314.17- Unused knockouts shall be closed by approved means. 362.30- ENT shall be secured at intervals not to exceed 3' and shall be secured with in 3' of terminations. 590.6- All temp power used for construction shall have GFCI protection.
|