Final | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Tom Saunders
|
|
|
Final for conference room floor plugs. Panel in room was swapped for new Eaton brand. All circuits existing besides floor plugs. I am on-site until 12 but there will be access all day Phone #: ###-#### Inspection requested via web by Sean Patton...job complete...ok to final
|
Electrical Rough-In | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Eric Story
|
|
|
Approval for cover on 12 floor boxes and one wall receptacle in adjacent hallway Phone #: ###-#### Inspection requested via web by Sean Patton U/g for floor outlets and conduits up walls and refrigerator receptacle ok to cover
|