ELE-Aging Inspection | 8/13/2020 | 8/13/2020 | 8/13/2020 | | PEND |
Daryl DeGrange
|
|
|
This permit is still open with the City of Boise. Please call with a progress report or any questions. If your job is complete, please schedule an final inspection online. pdsonline.cityofboise.org Thank you!
|
ELE-Aging Inspection | 5/14/2020 | 5/14/2020 | 5/18/2020 | | FAIL |
Daryl DeGrange
|
|
|
Permit lacking final inspection
|
Electrical Rough-In | 4/2/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
Tom Saunders
|
|
|
approx. 130'' underground. 3/4" pvc for future residential irrigation pump. We are going to upgrade service, install new exterior meter panel,extend and guy the mast, upsize grounding.. Trench is in backyard on east side of house, gate is on west side. You can see trench and pipe by looking over east gate. Phone #: ###-#### Inspection requested via web by Kelly Felin..ok to cover
|