Final | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Tom Saunders
|
|
|
Install Crew Lead: Brian Prussia ###-#### Electrician: Brian Lang ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting...OCPD, disconnect, and labelling ok
|
Electrical Rough-In | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PASS |
Tom Saunders
|
|
|
Phillips Hayman: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listed equipment verified...25A breaker installed in panel and labelled
|