Final | 4/10/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Mark Moncarr
|
|
|
###-####. Re-scheduled for 5/10/19. Homeowner said pool comp was coming back 5/8/19 to get pool ready for use after it was winterized. Some breakers were off, and I didnt want to turn them on and chance damaging pool equiptment. Ok final.
|
Final | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | CANC |
Mark Moncarr
|
|
|
Swimming pool electrical final Phone #: ###-#### Inspection requested via web by Lars Johnson Re-scheduled inspection for 5/10/19. Talked with homeowner, and he said the pool company was to come back on 5/8/19 and get pool running after being winterized. Some brkrs were off, and I didnt want to turn them on and chance damaging pool equiptment.
|
Electrical Rough-In | 5/22/2018 | 5/22/2018 | 5/22/2018 | P | PASS |
Mark Moncarr
|
|
|
EQ bonding plane wiring ; connection Phone #: ###-#### Inspection requested via web by Lars Johnson Ok cover.
|
Electrical Rough-In | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | PASS |
Mark Moncarr
|
|
|
Swimming pool underground and bonding Phone #: ###-#### Inspection requested via web by Lars Johnson Ok cover. 4 corners bonded, 2 LV lights N side.
|