Final | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Eric Story
|
|
|
Call me if you need me for anything or any questions, other wise we should be good! Thx, Steve Phone #: ###-#### Inspection requested via web by Steven Meredith Finl ok
|
Rough-In Permanent Service | 8/9/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Eric Story
|
|
|
We''ll be there Monday morning as Idaho Power is coming also that morning for the service swap over-change out! Phone #: ###-#### Inspection requested via web by Steven Meredith New garage ok to cover p/s u/g n ok
|
Electrical Rough-In | 4/20/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Mark Moncarr
|
|
|
We need a cover inspection on the trench too the new garage for the 2 in pvc raceway, trench ; cover material as well as final back fill ; finished elevations are provided by the on site GC, we installed the raceway only per I.P spec''s!
Thx. Steve BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Ok cover trench.
|