Permit Information
Permit NumberELE18-01503
StatusIssued
Name LANE MARTHA
Site Address 1003 E GREENWOOD CIR
Project NameLane-Peterson Addition
Customer Number 
ePlanReviewNo
Description
remodel
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
ELE-Aging Inspection5/22/20205/22/20205/28/2020 DONE
DetailsDaryl DeGrange
Homeowner working with field inspector to complete project.
Final2/28/20193/1/20193/1/2019AFAIL
DetailsJames Ady
Martha Phone #: ###-#### 406.12 All dwelling unit receptacles shall be tamper resistant. 334.12 NM cable shall be protected from physical damage. Missing lights, Wires hanging out of walls. No inspection on floor heat before cover. Recomended an electrician come in and finish project as owner will be out of town till July.
Permanent Service7/25/20187/26/20187/26/2018APASS
DetailsJames Ady
Doug Phone #: ###-#### p/s u/g n ok
Electrical Rough-In7/16/20187/16/20187/16/2018PPASS
DetailsJames Ady
Douglas-would like as late as possible Phone #: ###-#### Corrections made rough in only ok to cover
Electrical Rough-In7/11/20187/12/20187/12/2018AFAIL
DetailsJames Ady
Doug Phone #: ###-#### A/C wire stub needs moved up, Add recep in family rm on bath wall, Bath vanity recep needs refed from Bath circuit,Garage receps need seperated from lights, Dining 2gang wire support,Add recep under living rm window,Add recep in quilt rm under light switch,Add recep master bath vanity, Add kitchen counter receps left and right of sink.
Electrical Rough-In7/5/20187/6/20187/6/2018PPASS
DetailsJames Ady
Douglas-underground-husband Phone #: ###-####-would like you to call so he can meet you there Underground from ID power pole to house and pole to shop ok to cover Told owner to contact the City of Boise and ID power regarding Second service to the detatched garage. Need seperate address for shop.
Rough-In Permanent Service4/23/20184/23/20184/23/2018PCANC
DetailsJames Ady
Douglas Phone #: ###-####
Conference4/20/20184/20/20184/20/2018ADONE
DetailsJames Ady
Doug Phone# ###-#### Still early in the project. Was told to reschedule conference when building was farther along.
Conference4/19/20184/20/20184/20/2018ACANC
DetailsJames Ady
Doug Phone #: ###-#### called in twice