Final | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
James Ady
|
|
|
Please call prior to arrival. Phone #: ###-#### Inspection requested via web by Patrick Paz Final ok
|
Final | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | CANC |
James Ady
|
|
|
Please call prior to arrival. Phone #: ###-#### >> Inspection requested via web by Patrick Paz Inspection cancelled from web by: Patrick Paz
|
Electrical Rough-In | 5/15/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
James Ady
|
|
|
floor heat inspection. Please call prior to arrival. Phone #: ###-#### Inspection requested via web by Patrick Paz master floor heat only ok to cover
|
Electrical Rough-In | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | PASS |
James Ady
|
|
|
Please call prior to arrival. Phone #: ###-#### Inspection requested via web by Patrick Paz Master bath only rough in ok
|