Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Mark Moncarr
|
|
|
C of O a.m. inspection would be best Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok final. All panels labeled, range hood covers are all on.
|
Final | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Mark Moncarr
|
|
|
Stair tower A 1st-4th Trash and Janitor Closet 104 Electrical Room Mechanical room Maintenance Room Stair tower 2 Cage rooms 50 stack
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed
|
Final | 9/15/2019 | 9/16/2019 | 9/16/2019 | A | PART |
Mark Moncarr
|
|
|
Roof inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Rooftop units partial
|
Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | CANC |
Mark Moncarr
|
|
|
Roof inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Talked to electrician he needed to cancel
|
Electrical Rough-In | 8/30/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Mark Moncarr
|
|
|
Building A 1st Floor grid in B Area Corridors and lobby Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed
|
Final | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PART |
Mark Moncarr
|
|
|
A Building 2nd and 3rd Floor Corridors Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial on corriidor lighting.
|
Final | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PART |
Mark Moncarr
|
|
|
A Building 1st Floor A Area Corridor 3rd Floor Corridors and corresponding rooms Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for areas listed.
|
Electrical Rough-In | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PASS |
Mark Moncarr
|
|
|
Lights installed in center tiles in corridor. RU to close up exterior borders 1st floor.
|
Final | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PART |
Mark Moncarr
|
|
|
A Building 2nd Floor A and B units Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial on area listed. Bushings not used for hoods. Will check on next inspection.
|
Final | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PART |
Mark Moncarr
|
|
|
Building A 3rd Floor A and B Units Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial on units listed.
|
Final | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PART |
Mark Moncarr
|
|
|
A Building First floor A and B units Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for areas listed. Need to address spark rings for disposal recept. Will check next inspection
|
Electrical Rough-In | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building 1st Floor Breezeway grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover area listed. Electrician reviewed cut sheets supplied by sheetrock installer. Hardlid wire supports placed in areas needed to hold the weight of 2 layers of sheetrock.
|
Electrical Rough-In | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Mark Moncarr
|
|
|
A Building 4th floor west and north west corridor grid Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed
|
Electrical Rough-In | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building 1st Floor A Units, drops Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed
|
Electrical Rough-In | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building 2nd and 3rd Floor A area corridor drops Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed
|
Electrical Rough-In | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building 1st Floor B Units Drops Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building Drops in A and B units on 2nd Floor Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Daryl DeGrange
|
|
|
B Building A Area 1st Floor Corridor walls and Trash Compactor Room B Area 1st Floor Corridor walls and Lobby Area Phone #: ###-#### Inspection requested via web by Stephanie Huston Rough-in ok cover walls install drop ceilings
|
Electrical Rough-In | 6/5/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Rock A. Hudson
|
|
|
Building A 3rd Floor A Units Drop Lids Phone #: ###-#### Inspection requested via web by Stephanie Huston Area noted droplids rough in ok cover
|
Permanent Service | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Mark Moncarr
|
|
|
A Building Electrical Room 104 Service Gear Phone #: ###-#### Inspection requested via web by Stephanie Huston p/s u/g n ok
|
Electrical Rough-In | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Mark Moncarr
|
|
|
A Building Drop lids in 4th Floor A and B Units aswell as 3rd Floor B units Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building Area A and B corridors and common areas, 2nd Floor Includes Trash, janitor, cages, Lobby Common dinning, lounge, and bath room. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building 3rd Floor Corridor and common areas Just A and B Area Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Mark Moncarr
|
|
|
North West Stair Tower #2 all 4 floors Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building 4th Floor Corridor and lobby areas Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Mark Moncarr
|
|
|
Building A Area A 1st and 2nd Floor Units Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Mark Moncarr
|
|
|
Building A 4th and 3rd Floor A section units Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Mark Moncarr
|
|
|
Building A, B units rough in 3rd and 4th Floor B Area corridor SCR Cover B Area First Floor Mechanical A Area Corridor SCR Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 4/15/2019 | 4/16/2019 | 4/15/2019 | A | CANC |
Mark Moncarr
|
|
|
Building A, C units 1st Floor. Phone #: ###-#### >> Inspection requested via web by Stephanie Huston Inspection cancelled from web by: Stephanie Huston
|
Electrical Rough-In | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Mark Moncarr
|
|
|
A Building 1st and 2nd Floor B Units rough in. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
Electrical Rough-In | 7/2/2018 | 7/2/2018 | 7/2/2018 | A | PART |
Mark Moncarr
|
|
|
Underground south run to IP transformers Phone #: ###-#### Inspection requested via web by Stephanie Huston Parial cover conduit to trans.
|
Electrical Rough-In | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Mark Moncarr
|
|
|
Underground rough outside building. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover underground Bldg A.
|
Electrical Rough-In | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Mark Moncarr
|
|
|
Underground, deep layer west e room Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover conduit W side.
|
Electrical Rough-In | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Mark Moncarr
|
|
|
Ufer second building. Bar to be in by 1:30 Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover ufer bldg 2 N end.
|