Final | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Rock A. Hudson
|
|
|
Justin Phone #: ###-#### Final ok
|
Final | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Justin Phone #: ###-#### 314.20- Boxes mounted in a combustible materials shall be flush with such materials or have an extension ring installed. 406.9(B)- Receptacles installed in wet locations shall be weather resistant type and have a in use cover identified as extra duty. 406.12- All 15 or 20 amp 120 volt receptacles installed in or on a residential building shall be tamper resistant type.
|
Final | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | NH |
Rock A. Hudson
|
|
|
Justin Phone #: ###-#### Called 12:58pm, left message, was in area 25 minutes, no longer in area, please reschedule another day.
|
Electrical Rough-In | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
James Ady
|
|
|
Justin Phone #: ###-#### Shop rough in ok to cover
|
Electrical Rough-In | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Rock A. Hudson
|
|
|
Underground & rough in - Justin Phone #: ###-#### Seperation of grounds and neutrals at each shop location. All wiring existing may relocate 2 kiln circuits. Underground rough in ok cover
|
Conference | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | DONE |
Rock A. Hudson
|
|
|
Justin Phone #: ###-#### Discussed the replacement of a panel in one shop and sub-feeding another shop. A 200 amp 40 circuit main breaker panel going in green shop and a 100 amp sub to 2nd shop. Concrete encased electrode exists in green shop, 2nd shop will need 2 ground rods 6' or more apart. Discussed wire sizes and types of wiring meathods for underground, burial depth, and disconnecting means for each structure.
|