Electrical Rough-In | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Hidajet Zahic Ok cover kitch, 2 baths, garage space and upstairs.
|
Conference | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | DONE |
Mark Moncarr
|
|
|
CALL ME PRIOR TO ARRIVING Phone #: ###-#### Inspection requested via web by Hidajet Zahic Discussed bringing electrical up to current code. Any wall that is open needs to be brought up to code as far as outlet requirements in kitchen and other areas. Sub panel needs to be re-fed from 200a meter main. Conductors are not in conduit, they are single runs in the attic. All boxes need connectors, and possibly box extensions in some areas due to box fill.
|