Final | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Tom Saunders
|
|
|
rough in on LED kits for poles Phone #: ###-#### Inspection requested via web by Tim Dunlop...3 poles double heads...ok to final
|
Electrical Rough-In | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Tom Saunders
|
|
|
rough in on LED kits for poles Phone #: ###-#### Inspection requested via web by Tim Dunlop...UL listed equipment verified...driver and lamp kit
|