Final | 9/28/2018 | 9/28/2018 | 9/28/2018 | A | PASS |
Rock A. Hudson
|
|
|
Contact is Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell Final ok
|
Conference | 9/5/2018 | 9/6/2018 | 9/6/2018 | P | DONE |
James Ady
|
|
|
Please call Derek Ball at ###-#### to schedule the exact time and where to meet. Thanks Phone #: ###-#### Inspection requested via web by Scott Campbell Talked about Low volt festoon lighting. Will change festoon cable to fit clamps. Ultamately up to public works.
|
Electrical Rough-In | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Rock A. Hudson
|
|
|
Contact is Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell 7 eastern bases btween capitol and 8th st rough in ok cover
|
Electrical Rough-In | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | CANC |
Rock A. Hudson
|
|
|
Underground inspection - contact Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell Requested by mistake no inspection needed.
|
Electrical Rough-In | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | PASS |
Rock A. Hudson
|
|
|
As early as possible please. Contact is Derek Ball. Thanks, Phone #: ###-#### Inspection requested via web by Scott Campbell From 8th to 9th east end underground rough in ok cover
|
Electrical Rough-In | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Rock A. Hudson
|
|
|
Underground inspection on "Freak Alley" - contact is Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell As per Daryl DeGrange ok to install a IMC or rigid 4" below 8" pour with warning tape in alley. From 8th to 9th lighting underground rough in ok cover
|
Electrical Rough-In | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Rock A. Hudson
|
|
|
Grounding inspection -contact is Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell Pole bases only located in alley between 8th and 9th street. Base pour rough in ok cover
|