Final | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Eric Story
|
|
|
Joe Phone #: ###-#### final ok
|
Permanent Service | 12/31/2018 | 1/2/2019 | 1/2/2019 | A | PASS |
Mark Moncarr
|
|
|
This was inspected and passed once already but denied by the power company so I had to change out the meter-main Phone #: ###-#### Inspection requested via web by Joe Easley Existing installation of meter main with red handle bypass switch on supply side, not accepted as per IDP. New install of meter main with 2-200a disc, 1 for house, and 1 for ADU installed. p/s o/h n ok
|
Permanent Service | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Mark Moncarr
|
|
|
Joe Phone #: ###-#### p/s o/h n ok
|
Electrical Rough-In | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Tom Saunders
|
|
|
jOE Phone #: ###-####...
rough ok to cover
|