DOC - Permit Finaled | | | 8/22/2018 | | DONE |
|
|
|
|
Electrical Rough-In | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
James Ady
|
|
|
Mark-underground Phone #: ###-#### remaining section of 3in conduits. ok to cover
|
Electrical Rough-In | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
James Ady
|
|
|
underground // Mark Phone #: ###-#### 4 3in conduits headed E through center of building from electrical room. 1st 80ft only ok to cover
|
Electrical Rough-In | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Daryl DeGrange
|
|
|
for cover // Mark Phone #: ###-#### rough 0k cover under slab 4-3" service conduits to laurdry room
|
Electrical Rough-In | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Rock A. Hudson
|
|
|
Mark--rough in for underground cover Phone #: ###-#### Underground from gear to distibution panels and stubs to the west rough in ok cover
|
Electrical Rough-In | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
James Ady
|
|
|
underground // Mark Phone #: ###-#### Underground from transformer pad to electrical room only ok to cover
|
Conference | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Daryl DeGrange
|
|
|
Mark hansen--underground ufer inspection Phone #: ###-#### Discuss street underground
|
Electrical Rough-In | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Daryl DeGrange
|
|
|
Mark hansen--underground ufer inspection Phone #: ###-#### Rough-in ok cover 3/0 cu. concrete encased electrode
|