Final | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | PASS |
James Ady
|
|
|
Partial final Phone #: ###-#### Inspection requested via web by cris flores Final ok
|
Electrical Rough-In | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
James Ady
|
|
|
2nd floor inspection Phone #: ###-#### Inspection requested via web by cris flores correction made 204 ready for final.
|
Electrical Rough-In | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PART |
James Ady
|
|
|
Partial final 3rd and 2nd floor. Phone #: ###-#### Appt. 204 Reverse polarity in Kitchen GFCI above dishwasher. 201,202,203 checked and ready for final
|
Final | 3/28/2019 | 4/1/2019 | 4/1/2019 | A | CANC |
James Ady
|
|
|
Partial final 3rd and 2nd floor. Phone #: ###-#### Inspection requested via web by cris flores
|
Electrical Rough-In | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
James Ady
|
|
|
Partial final 3rd and 2nd floor. Phone #: ###-#### Inspection requested via web by cris flores 3rd floor hot check ok. Ready for final
|
Final | 3/13/2019 | 3/13/2019 | 3/13/2019 | A | FAIL |
James Ady
|
|
|
Partial final on 3rd floor Phone #: ###-#### Inspection requested via web by cris flores 440.6A Nameplate of equipment shall be used to determine branch circuit conductors and Disc size.(29.5amp min, 40amp max. 10awg min. 12awg ran.)
|
Rough-In Permanent Service | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by cris flores p/s u/g n ok
|
Electrical Rough-In | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
James Ady
|
|
|
Ground cover also Phone #: ###-#### Inspection requested via web by cris flores 2nd and 3rd floor Bedroom Sliding door will not have balcony as per builder. 1st,2nd,3rd floor , common stair area and underground for path lighting ok to cover.
|
Electrical Rough-In | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
James Ady
|
|
|
Wall cover Phone #: ###-#### Inspection requested via web by cris flores 210.52 Area next to fixed door panels shall have receps. Balcony/patio shall have Light and receps
|