Final | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Eric Story
|
|
|
Need final dishwashers are hooked up permanent Phone #: ###-#### Inspection requested via web by robert feller Final ok card not on site
|
Final | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Eric Story
|
|
|
We will be on site thanks. Phone #: ###-#### Inspection requested via web by robert feller Temp occ only,card signed. Will final once diswashers are set, EC will place warning signs on heaters to prevent storage in front of them in furnace rooms.
|
Permanent Service | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Eric Story
|
|
|
We are having the power disconnected at about 10 am. and then we have to connect the new panels to the main service. We hope to be done by about noon, so if possible to inspect after noon should be done. And will need to get power back on as soon as we can. Thanks Phone #: ###-#### Inspection requested via web by robert feller IDPCO already energized prior to inspection and AFC calc will be posted at final and they fuses so should be ok p/s o/h ec ok
|
Electrical Rough-In | 8/21/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Eric Story
|
|
|
Need ceiling inspection for cover will be on site Phone #: ###-#### Inspection requested via web by robert feller Suspended ceilings only ok to cover
|
Electrical Rough-In | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Eric Story
|
|
|
Need back half of job inspected for sheetrock cover walls and some ceilings. Area starts at the CMU wall and goes to the west exterior wall. We will not be on site job should be open. Phone #: ###-#### Inspection requested via web by robert feller Back area walls and hard lids ok to cover
|
Electrical Rough-In | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | PASS |
Eric Story
|
|
|
We will be on site. Need walls inspected from the interior CMU wall to the front of the building only. Phone #: ###-#### Inspection requested via web by robert feller Part 1 walls only ok to cover
|
Electrical Rough-In | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | PASS |
Eric Story
|
|
|
groundwork- Bob Phone #: ###-#### Floor box for front of building ok to cover
|