Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberELE18-01887
StatusFinaled
Name M & B ELECTRIC
Site Address 1325 S VISTA AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
New: New lighting, outlets, panels, mechanical equipment,
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/12/201811/13/201811/13/2018APASS
DetailsEric Story
Need final dishwashers are hooked up permanent Phone #: ###-#### Inspection requested via web by robert feller
Final ok card not on site
Final8/27/20188/27/20188/27/2018PPART
DetailsEric Story
We will be on site thanks. Phone #: ###-#### Inspection requested via web by robert feller
Temp occ only,card signed. Will final once diswashers are set, EC will place warning signs on heaters to prevent storage in front of them in furnace rooms.
Permanent Service8/24/20188/24/20188/24/2018PPASS
DetailsEric Story
We are having the power disconnected at about 10 am. and then we have to connect the new panels to the main service. We hope to be done by about noon, so if possible to inspect after noon should be done. And will need to get power back on as soon as we can. Thanks Phone #: ###-#### Inspection requested via web by robert feller
IDPCO already energized prior to inspection and AFC calc will be posted at final and they fuses so should be ok
p/s o/h ec ok
Electrical Rough-In8/21/20188/22/20188/22/2018PPASS
DetailsEric Story
Need ceiling inspection for cover will be on site Phone #: ###-#### Inspection requested via web by robert feller
Suspended ceilings only ok to cover
Electrical Rough-In7/23/20187/23/20187/23/2018PPASS
DetailsEric Story
Need back half of job inspected for sheetrock cover walls and some ceilings. Area starts at the CMU wall and goes to the west exterior wall. We will not be on site job should be open. Phone #: ###-#### Inspection requested via web by robert feller
Back area walls and hard lids ok to cover
Electrical Rough-In6/20/20186/20/20186/20/2018PPASS
DetailsEric Story
We will be on site. Need walls inspected from the interior CMU wall to the front of the building only. Phone #: ###-#### Inspection requested via web by robert feller
Part 1 walls only ok to cover
Electrical Rough-In5/18/20185/21/20185/21/2018APASS
DetailsEric Story
groundwork- Bob Phone #: ###-####
Floor box for front of building ok to cover