Permit Information
Permit NumberELE18-01889
StatusFinaled
Name POWER PLUS INC
Site Address 9492 W EMERALD ST
Project NameThe Salvation Army
Customer Number1515
ePlanReviewNo
Description
Alteration: Elec. for Salvation Army Building. (Bld17-04447)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/11/20199/11/20199/11/2019PPASS
DetailsTom Saunders
final Phone #: ###-#### Inspection requested via web by Debby Pierce...job complete...ok to final
Electrical Rough-In9/10/20199/10/20199/10/2019PPASS
DetailsJames Ady
exterior Phone #: ###-#### Inspection requested via web by Debby Pierce exterior lighting and receps including parking lot
Electrical Rough-In9/5/20199/6/20199/6/2019APASS
DetailsTom Saunders
Kitchen Phone #: ###-#### Inspection requested via web by Debby Pierce...area ok to final and occupy
Electrical Rough-In8/28/20198/28/20198/28/2019APASS
DetailsTom Saunders
west side excluding kitchen and pantry Phone #: ###-#### Inspection requested via web by Debby Pierce...areas for final for occupency...areas markeded on print out...rooftop units complete-issues addressed
Electrical Rough-In8/23/20198/26/20198/26/2019APASS
DetailsTom Saunders
gym. Phone #: ###-#### Inspection requested via web by Debby Pierce...gym complete...ok for needed occupency
Electrical Rough-In8/20/20198/20/20198/20/2019APASS
DetailsTom Saunders
roof top units....
6 units...4 units ok
2 units...panel H1A breaker space 246 and 135 need downsized to 70A....check at future inspection
Electrical Rough-In8/1/20198/1/20198/1/2019PCANC
DetailsTom Saunders
gym Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
Electrical Rough-In7/30/20197/31/20197/31/2019APASS
DetailsTom Saunders
Kitchen ceiling Phone #: ###-#### Inspection requested via web by Debby Pierce...grid ok to cover
Electrical Rough-In7/23/20197/24/20197/24/2019APASS
DetailsTom Saunders
Jerome Ferlitch is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce....
ceiling grid...west end of building excluding kitchen at this time
Electrical Rough-In6/10/20196/11/20196/10/2019ACANC
DetailsTom Saunders
1st floor ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
Electrical Rough-In5/3/20195/6/20195/6/2019PPASS
DetailsJames Ady
hard lids west building
underground site. Phone #: ###-#### Inspection requested via web by Debby Pierce West end Restrooms, West kitchen entry, South Gym entry Hard lids only. East, North parking lot lighting Underground only OK to cover
Permanent Service4/12/20194/15/20194/15/2019PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Debby Pierce....
p/s u/g new ok
Electrical Rough-In4/4/20194/5/20194/5/2019APASS
DetailsTom Saunders
wall rough in west building Phone #: ###-#### Inspection requested via web by Debby Pierce...all walls ok to cover
Conference12/4/201812/4/201812/4/2018APASS
DetailsTom Saunders
discussed one siding for specific areas
ok to one side 4ft down for ducting and piping as needed..discussed one siding of future areas and future conferences scheduled for those areas
Electrical Rough-In7/24/20187/24/20187/24/2018APASS
DetailsTom Saunders
underground, Steve Hook is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...underground gym floor, feeders electrical rm, and feeders to 2nd electrical rm...ok to cover
Electrical Rough-In7/3/20187/5/20187/5/2018APASS
DetailsRock A. Hudson
UFER Underground Inspection. Steve Hook is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce
Discussed the need for an electrical permit for each BLD permit. 1 permit for gym, kitchen ect. and 1 permit for chapel and daycare. Contact to call and confirm permit issues. Concrete encased electrode on west side rough in ok cover