Final | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Tom Saunders
|
|
|
final Phone #: ###-#### Inspection requested via web by Debby Pierce...job complete...ok to final
|
Electrical Rough-In | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
James Ady
|
|
|
exterior Phone #: ###-#### Inspection requested via web by Debby Pierce exterior lighting and receps including parking lot
|
Electrical Rough-In | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Tom Saunders
|
|
|
Kitchen Phone #: ###-#### Inspection requested via web by Debby Pierce...area ok to final and occupy
|
Electrical Rough-In | 8/28/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Tom Saunders
|
|
|
west side excluding kitchen and pantry Phone #: ###-#### Inspection requested via web by Debby Pierce...areas for final for occupency...areas markeded on print out...rooftop units complete-issues addressed
|
Electrical Rough-In | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PASS |
Tom Saunders
|
|
|
gym. Phone #: ###-#### Inspection requested via web by Debby Pierce...gym complete...ok for needed occupency
|
Electrical Rough-In | 8/20/2019 | 8/20/2019 | 8/20/2019 | A | PASS |
Tom Saunders
|
|
|
roof top units.... 6 units...4 units ok 2 units...panel H1A breaker space 246 and 135 need downsized to 70A....check at future inspection
|
Electrical Rough-In | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | CANC |
Tom Saunders
|
|
|
gym Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
|
Electrical Rough-In | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Tom Saunders
|
|
|
Kitchen ceiling Phone #: ###-#### Inspection requested via web by Debby Pierce...grid ok to cover
|
Electrical Rough-In | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Tom Saunders
|
|
|
Jerome Ferlitch is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce.... ceiling grid...west end of building excluding kitchen at this time
|
Electrical Rough-In | 6/10/2019 | 6/11/2019 | 6/10/2019 | A | CANC |
Tom Saunders
|
|
|
1st floor ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
|
Electrical Rough-In | 5/3/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
James Ady
|
|
|
hard lids west building underground site. Phone #: ###-#### Inspection requested via web by Debby Pierce West end Restrooms, West kitchen entry, South Gym entry Hard lids only. East, North parking lot lighting Underground only OK to cover
|
Permanent Service | 4/12/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce.... p/s u/g new ok
|
Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Tom Saunders
|
|
|
wall rough in west building Phone #: ###-#### Inspection requested via web by Debby Pierce...all walls ok to cover
|
Conference | 12/4/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Tom Saunders
|
|
|
discussed one siding for specific areas ok to one side 4ft down for ducting and piping as needed..discussed one siding of future areas and future conferences scheduled for those areas
|
Electrical Rough-In | 7/24/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Tom Saunders
|
|
|
underground, Steve Hook is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...underground gym floor, feeders electrical rm, and feeders to 2nd electrical rm...ok to cover
|
Electrical Rough-In | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Rock A. Hudson
|
|
|
UFER Underground Inspection. Steve Hook is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Discussed the need for an electrical permit for each BLD permit. 1 permit for gym, kitchen ect. and 1 permit for chapel and daycare. Contact to call and confirm permit issues. Concrete encased electrode on west side rough in ok cover
|