Final | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Tom Saunders
|
|
|
Brian--please call 30 mins ahead Phone #: ###-####...ok to final
|
Rough-In Permanent Service | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Tom Saunders
|
|
|
Brian Phone #: ###-####....p/s u/g rec ok...rough-in of hot tub fail...windows need tempering film, need to bond gutter, GFCI protect light-all within 5' edge and lower then 12' of hot tub...also needs to reposition breakers in all and one-swap positions of hot tub and house OCPD
|