Final | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
James Ady
|
|
|
Final inspection for the B17C Lobby Contact Pierre Elskamp Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Final ok
|
Electrical Rough-In | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
James Ady
|
|
|
Rough in inspection for the lobby tee grid ceilings Contact Pierre Elskamp Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Lobby grid only ok to cover
|
Electrical Rough-In | 7/6/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
James Ady
|
|
|
Lobby restrooms walls and ceilings, and the lobby interview rooms walls and ceilings Contact Toby Davis Thank you. Phone #: ###-#### Inspection requested via web by Tom Betty Walls and ceilings in interview rooms and restrooms ok to cover. Note: there are no light fixtures going in interview room ceiling.
|
Electrical Rough-In | 7/3/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
James Ady
|
|
|
Inspection for the sink walls only and ceilings in the main corridor men''s and women''s restrooms Contact Toby Davis Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Back wall of the interview rooms and Ceilings of mens and womans bathrooms only
|
Electrical Rough-In | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | PASS |
James Ady
|
|
|
West Lobby (Building 17C) ceiling inspection Contact Toby Davis Thank you Phone #: ###-#### Inspection requested via web by Tom Betty waiting area only hard lid only ok to cover
|
Electrical Rough-In | 6/1/2018 | 6/4/2018 | 6/4/2018 | A | PASS |
James Ady
|
|
|
Ceiling and underground inspection, as per Pierre. Phone #: ###-#### Inspection requested via web by Tom Betty Hard lid phase 1 only. Access points needed for all J boxes. I have pictures and locations. Hard lid only ok
|