Final | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final. All plates installed, and fixtures hung.
|
Final | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | NR |
Mark Moncarr
|
|
|
Owner said all covers are in place and ready for inspection Phone #: ###-#### Inspection requested via web by Kendra Lanham
|
Final | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | NR |
Mark Moncarr
|
|
|
Final Phone #: ###-#### Inspection requested via web by Kendra Lanham All apt panels needing panel blanks upper right corner, except apt#5. Sheetrock needs installed in some apts before final.
|
Electrical Rough-In | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Mark Moncarr
|
|
|
I just need an inspection on the grounding only.- Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok cover 3/0 cu electrode cond at back of building. Electrode cond will be covered by min 4 in concrete
|
Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Eric Story
|
|
|
Final Rough in - U-Fer ground is not in yet (Waiting on excavator for pad) If you have questions please call Todd @ ###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham 1st floor ok to cover
|
Electrical Rough-In | 6/5/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Mark Moncarr
|
|
|
Electrical Rough-in - Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok cover upstairs.
|