ELE-Aging Inspection | 6/30/2020 | 6/30/2020 | 6/30/2020 | | PEND |
Daryl DeGrange
|
|
|
The permit is still open with the City of Boise. Please call 208 ###-#### with progress report or any questions. If your job is complete, please schedule an final inspection online. Thank you!
|
Permanent Service | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jake Cutler A concrete pad is to be poured in front of new service disconnect and meters. 2 grd rods. Metal hand rail was removed from in front of all panel locations. A new grate is to be installed in window well to allow for code compliant access to all panels. Cords being used for temp power to all units panels is SEOOW #6 SO cord. New service drop moving to left of existing service. p/s o/h n ok
|
Conference | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | DONE |
Mark Moncarr
|
|
|
Final apartment 2 and conference about meter bank Phone #: ###-#### Inspection requested via web by Jake Cutler Discussed new service size and location on back of building, and feeding apartments with new range circuit and wall mount heater circuits. Total load calc on all units combined is around 380a. New 400a service being installed.
|
Final | 7/18/2018 | 7/18/2018 | 7/18/2018 | A | PART |
Mark Moncarr
|
|
|
Partial final for Apt#2.
|
Conference | 7/11/2018 | 7/17/2018 | 7/16/2018 | A | CANC |
Mark Moncarr
|
|
|
Final on one apartment and conference on service change. Phone #: ###-#### >> Inspection requested via web by Jake Cutler Inspection cancelled from web by: Jake Cutler
|