Final | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman Phase 2 and 3 final ok
|
Electrical Rough-In | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
James Ady
|
|
|
Electrical rough in for the third phase Phone #: ###-#### Inspection requested via web by Ron Zimmerman Phase 3 rough in ok
|
Electrical Rough-In | 10/17/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
James Ady
|
|
|
ceiling inspection Phone #: ###-#### Inspection requested via web by Ron Zimmerman phase 2 ceilings only ok to cover
|
Rough-In Permanent Service | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Eric Story
|
|
|
Walls Phone #: ###-#### Inspection requested via web by Ron Zimmerman Walls and 1 hard lid ok to cover
|
Final | 8/3/2018 | 8/3/2018 | 8/3/2018 | A | PART |
James Ady
|
|
|
THis is a final for occupancy for phase one only. Phase two will start shortly under the same permit. Phone #: ###-#### Inspection requested via web by Ron Zimmerman Phase 1 only TCO ok
|
Electrical Rough-In | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
James Ady
|
|
|
Ceiling Grid Phone #: ###-#### Inspection requested via web by Ron Zimmerman Ceiling only ok to cover
|
Electrical Rough-In | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Eric Story
|
|
|
hard ceiling rough in Phone #: ###-#### Inspection requested via web by Ron Zimmerman Hard Lid ceiling in Lasik room ok to cover
|
Electrical Rough-In | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | PASS |
James Ady
|
|
|
entreance to project is on the west side between the two buildings Phone #: ###-#### Inspection requested via web by Ron Zimmerman Walls only Phase 1. OK to cover
|