Final | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
James Ady
|
|
|
ELE is completed. Thanks Phone #: ###-#### Inspection requested via web by CHRIS CARMINE final ok
|
Final | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | NR |
James Ady
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Switches not installed and several receps not working.
|
Electrical Rough-In | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
James Ady
|
|
|
Paul Phone #: ###-#### ceiling only ok to cover
|
Electrical Rough-In | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | CANC |
James Ady
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by CHRIS CARMINE
|
Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
James Ady
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Remaining wall in conference room ok to cover
|
Electrical Rough-In | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
James Ady
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Conference room needs floor recep. Do not cover. All other areas ok walls only ok to cover
|