Final | 6/26/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Tom Saunders
|
|
|
panels will be placed back on after rough in and ready Phone #: ###-#### Inspection requested via web by Ashley Rasmussen...OCPD, disconnect, and labelling verified...ok to final
|
Electrical Rough-In | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
Tom Saunders
|
|
|
will have panels removed for rough at 11am Phone #: ###-#### Inspection requested via web by Ashley Rasmussen...UL listing verified on all equipment
|
Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen....Boise City requirement that rough inspection be performed before a final can be scheduled...contractor must be onsite to remove panels and verify UL listing of equipment and proper grounding before a final will be given
|