Final | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | PASS |
Eric Story
|
|
|
Call or text proir to arrival ###-#### Final k
|
Final | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | CANC |
Eric Story
|
|
|
Joe Phone #: ###-#### Will re-schedule for next day
|
Rough-In Permanent Service | 11/16/2018 | 12/3/2018 | 12/3/2018 | A | PASS |
Eric Story
|
|
|
Joseph Phone #: ###-####-please go as early as poss so I P an turn back on p/s o/h rec ok
|
Electrical Rough-In | 6/20/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Eric Story
|
|
|
Call 20 minutes // Joe Phone #: ###-#### Kitchen only at this time owner stated he was not wiring basement due to funds and will need a seperate permit if this one needs to be closed out. Ok to cover kitchen
|
Conference | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | DONE |
Mark Moncarr
|
|
|
call 15 min ahead- Joseph Phone #: ###-#### Discussed outlet layout in kitchen. Need to change ceiling box in living to fan rated box.
|