Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
James Ady
|
|
|
I will have a ladder set up and pull off a solar panel and optimizer since we forgot to call in the rough in. Phone #: ###-#### Inspection requested via web by Jesse Simpson final ok
|
Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
James Ady
|
|
|
I will have a ladder set up and pull off a solar panel and optimizer since we forgot to call in the rough in. Phone #: ###-#### Inspection requested via web by Jesse Simpson panels were removed from roof and listing varified. rough in ok
|
Electrical Rough-In | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | CANC |
Eric Story
|
|
|
I will call at noon to schedule a time to meet you onsite. Phone #: ###-#### >> Inspection requested via web by Jesse Simpson Inspection cancelled from web by: Jesse Simpson
|