Final | 3/18/2019 | 3/18/2019 | 3/18/2019 | A | PASS |
Tom Saunders
|
|
|
final to close permit...work done under permit number ELE18-02844
|
Conference | 6/18/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Eric Story
|
|
|
Please call when headed to job so I can meet you there thanks. Phone #: ###-#### Inspection requested via web by Trevor Soesbe Discussed service change location and requirements(still need info from IPCO to see if transformer can handle the load) All circuits will be refeed and all old existing wiring will be removed.
|