Final | 5/31/2019 | 6/3/2019 | 6/3/2019 | A | PASS |
James Ady
|
|
|
Go through the gate into the back yard. It is the pool house. If you have any questions please feel free to contact Jason ###-#### or Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan final ok
|
Electrical Rough-In | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Eric Story
|
|
|
This is for the pool house and outdoor kitchen in the back. It will be open. If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Pool house ok to cover, Electrician will verify if a bond is needed for hot tub to metal post
|
Electrical Rough-In | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
James Ady
|
|
|
This is an underground inspection. If you have any questions please feel free to contact Jake ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Grounding electrode and underground from house to pool panel ok to cover
|