Final | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | PASS |
Eric Story
|
|
|
Final ok
|
Final | 11/21/2018 | 11/26/2018 | 11/21/2018 | A | FAIL |
Eric Story
|
|
|
Brad Phone #: ###-#### Ok to move furniture in all plugs tested out for life safety. Need flu moved as it obstructs work space clearences
|
Electrical Rough-In | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | PASS |
Eric Story
|
|
|
Brad Phone #: ###-#### Rough-in ok to cover
|
Electrical Rough-In | 9/27/2018 | 9/28/2018 | 9/28/2018 | P | CANC |
Eric Story
|
|
|
Brad Phone #: ###-#### Conference needed
|
Conference | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | DONE |
Eric Story
|
|
|
Brad Phone #: ###-#### Discussed same items as the previos conference
|
Conference | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | DONE |
Eric Story
|
|
|
Look at service with unfused conductors install in race way Discussed service change due to unfused conductors ran in structure. Owner will change to a dual meter pack with main disc and re ground all services
|
Conference | 9/17/2018 | 9/20/2018 | 9/20/2018 | A | DONE |
Eric Story
|
|
|
please call 10 mins ahead- Brad Phone #: ###-#### Discussed all code requirements needed for complete re-wire of apartment,Owner will be living in the unit and has a good grasp of electrical work.....
|