Final | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Eric Story
|
|
|
Correction fixed final ok
|
Final | 8/14/2018 | 8/15/2018 | 8/15/2018 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan No violation shall be retained BCO Receptacle located in bath accross from tu=b needs GFCI protection and is also in footprint of bathroom
|
Electrical Rough-In | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Floor heat ok to cover, hall bath and master bath ok to cover
|
Electrical Rough-In | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Flat cable shall not be secured on edge, NM cable shall be secured within 8in of box and every4.5ft, cable sheething shall extend 1/4in inside box(hall vanity light) nail plates through out, Bath vanity circuit shall be 20amp and shall serve no others, recep shall be within 36in of vanity basin,Master bed switch box overfilled,14awg on 20amp circuit( Master bed fan and master vanity lights), Screw on boxes shall be listed for the purpose( Master vanity switch)
|
Electrical Rough-In | 6/22/2018 | 6/25/2018 | 6/22/2018 | A | CANC |
James Ady
|
|
|
Phone #: ###-#### >> Inspection requested via web by steve ragan Inspection cancelled from web by: steve ragan
|