Final | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Eric Story
|
|
|
Please contact electrician on site Rod Tomlinson. Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty Final ok....... card signed
|
Electrical Rough-In | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Tom Saunders
|
|
|
Rough-in for cover for the hallway ceilings Contact Rod Tomlinson Thank you Phone #: ###-#### Inspection requested via web by Tom Betty....ok to cover ceiling grid hallways around cleanroom..earthquake clips verified barrier tiles removed for inspection
|
Electrical Rough-In | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Tom Saunders
|
|
|
Rough-in wall inspection. Phone #: ###-#### Inspection requested via web by Cathy Duchek...ok to cover exterior walls of clean rm ...m/c material used to wire prefabed walls of clean room to cut in boxes
|