Final | 10/11/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Eric Story
|
|
|
Justin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Corrections fixed final ok
|
Final | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | FAIL |
James Ady
|
|
|
Justin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg 3 quad receps on N wall dead 210.8 all receps in an unfinished basement shall be GFCI protected Re-call when fixed
|
Final | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | NR |
Mark Moncarr
|
|
|
David ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg
|
Electrical Rough-In | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
James Ady
|
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Basement only, Area will be storage and work shop area. Unfinished. All circuits will need GFCI prtection as per 210.8A5 rough in only ok
|