Final | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
James Ady
|
|
|
Would also like an inspection of the ceiling for cover job should be open Phone #: ###-#### Inspection requested via web by robert feller no sign off sheet on site final ok
|
Electrical Rough-In | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
James Ady
|
|
|
Would also like an inspection of the ceiling for cover job should be open Phone #: ###-#### Inspection requested via web by robert feller ceiling ok to cover
|
Electrical Rough-In | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
James Ady
|
|
|
We will not be there installed some outlets and data in new walls, just need walls inspected for sheetrock. Can access at 8 am. Phone #: ###-#### Inspection requested via web by robert feller Added 2 walls Removed other. 2 new walls ok to cover only
|