Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE18-02479
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 999 W MAIN ST
Project NameCH2M HILL
Customer Number3812
ePlanReviewNo
Description
Alteration: Electrical install including wiring, lighting, tele/data, fire alarm, and floor boxes
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/26/201811/26/201811/26/2018APASS
DetailsRock A. Hudson
Contact Jon Novak.
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
Final10/26/201810/28/201810/29/2018PPART
DetailsRock A. Hudson
Floors 10 and 12 TCO ok
Final10/26/201810/26/201810/26/2018PFAIL
DetailsRock A. Hudson
Temporary Occupancy Inspection at the One Cap building level 10 ; 12.
Contact Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Level 10 electrical contractor had not energized circuits for receptacles and furniture at time of inspection.
300.15- All wiring shall terminate in a box. Several sections of furniture still need connected to building wiring.
406.6- Receptacles shall be securely mounted to a box and covers in place. Tile being installed in break area, receptacles have been removed from boxes and hanging on wiring.
330.12- MC cable shall not be installed where subject to physical damage. Stubs to furniture along widow walls exposed on window frame and enter lower wall. Shall be installed in a protective conduit or channel.
Unable to test this floor.
Level 12 same as 10 unable to test.
If contractor requests I offered to come in on Sunday to inspect. Informed contact must be made to building official and additional fee paid.
Electrical Rough-In10/22/201810/22/201810/22/2018PPART
DetailsRock A. Hudson
Ceiling rough in inspection for level 10 at the One Capital building
Please contact electrician on site Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Open office areas grid rough in ok cover
Electrical Rough-In10/15/201810/15/201810/15/2018PPASS
DetailsRock A. Hudson
Ceiling rough in inspection for level 12 CH2M at the One Capitol building
Contact Jon Novak
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
Level 12 office grid rough ok cover
Electrical Rough-In10/8/201810/9/201810/9/2018APASS
DetailsRock A. Hudson
Soffit rough in for level 10 CH2M at One Cap
Contact Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Tom Betty
Soffits as noted rough in ok cover
Electrical Rough-In10/2/201810/3/201810/3/2018APASS
DetailsRock A. Hudson
Ceiling cover inspection for level 12 CH2M at the One Cap building
Contact Jon Novak
Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty
S.E. and S.W. open office areas only as noted on contractor print grid rough in ok cover
Electrical Rough-In9/17/20189/18/20189/18/2018APASS
DetailsRock A. Hudson
Hard Lid rough In for level 12
Contact Jon Novak
Thank you. Phone #: ###-#### Inspection requested via web by Tom Betty
Soffits and hardlids rough in ok cover
Electrical Rough-In8/20/20188/20/20188/20/2018PPASS
DetailsRock A. Hudson
Wall inspection for level 10 CH2M
Contact Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Tom Betty
MFP area walls rough in ok cover
Electrical Rough-In8/15/20188/15/20188/15/2018APART
DetailsRock A. Hudson
Wall rough-in inspection for level 10 CH2M in One Cap building
Contact Jon Novak
Thank you Phone #: ###-#### Inspection requested via web by Tom Betty
Hold on MFP wall and to west due to boxes behind new wall shall be abandoned prior to cover. Rest of walls rough in ok cover.
Electrical Rough-In8/6/20188/6/20188/6/2018PPASS
DetailsRock A. Hudson
Wall rough in for level 12 CH@M at the One Cap building.
Contact Jon Novak
Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty
Confirmed conference rooms drawing complys with 2017 NEC. Walls on level 12 rough in ok cover