Final | 11/26/2018 | 11/26/2018 | 11/26/2018 | A | PASS |
Rock A. Hudson
|
|
|
Contact Jon Novak. Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Final | 10/26/2018 | 10/28/2018 | 10/29/2018 | P | PART |
Rock A. Hudson
|
|
|
Floors 10 and 12 TCO ok
|
Final | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Temporary Occupancy Inspection at the One Cap building level 10 ; 12. Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 10 electrical contractor had not energized circuits for receptacles and furniture at time of inspection. 300.15- All wiring shall terminate in a box. Several sections of furniture still need connected to building wiring. 406.6- Receptacles shall be securely mounted to a box and covers in place. Tile being installed in break area, receptacles have been removed from boxes and hanging on wiring. 330.12- MC cable shall not be installed where subject to physical damage. Stubs to furniture along widow walls exposed on window frame and enter lower wall. Shall be installed in a protective conduit or channel. Unable to test this floor. Level 12 same as 10 unable to test. If contractor requests I offered to come in on Sunday to inspect. Informed contact must be made to building official and additional fee paid.
|
Electrical Rough-In | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PART |
Rock A. Hudson
|
|
|
Ceiling rough in inspection for level 10 at the One Capital building Please contact electrician on site Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Open office areas grid rough in ok cover
|
Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling rough in inspection for level 12 CH2M at the One Capitol building Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 12 office grid rough ok cover
|
Electrical Rough-In | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Rock A. Hudson
|
|
|
Soffit rough in for level 10 CH2M at One Cap Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Soffits as noted rough in ok cover
|
Electrical Rough-In | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling cover inspection for level 12 CH2M at the One Cap building Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty S.E. and S.W. open office areas only as noted on contractor print grid rough in ok cover
|
Electrical Rough-In | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Rock A. Hudson
|
|
|
Hard Lid rough In for level 12 Contact Jon Novak Thank you. Phone #: ###-#### Inspection requested via web by Tom Betty Soffits and hardlids rough in ok cover
|
Electrical Rough-In | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Rock A. Hudson
|
|
|
Wall inspection for level 10 CH2M Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Tom Betty MFP area walls rough in ok cover
|
Electrical Rough-In | 8/15/2018 | 8/15/2018 | 8/15/2018 | A | PART |
Rock A. Hudson
|
|
|
Wall rough-in inspection for level 10 CH2M in One Cap building Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Hold on MFP wall and to west due to boxes behind new wall shall be abandoned prior to cover. Rest of walls rough in ok cover.
|
Electrical Rough-In | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Rock A. Hudson
|
|
|
Wall rough in for level 12 CH@M at the One Cap building. Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty Confirmed conference rooms drawing complys with 2017 NEC. Walls on level 12 rough in ok cover
|