Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberELE18-02489
StatusFinaled
Name ENERGY ENTERPRISE GROUP LLC
Site Address 1005 W MAIN ST
Project Name 
Customer Number681-CS
ePlanReviewNo
Description
Alteration: ELECTRICAL FOR CORE AND SHELL
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/20/201812/20/201812/20/2018APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Stairway between 3 and 4 not done but all wiring in area associated with TI permit. Final ok
Final12/7/201812/7/201812/7/2018PFAIL
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
BCC- Electrical permit from city of Boise required for elevator installation.
300.15- All boxes shall have covers, basement "L" shaped box and sump pump wiring.
250.30(A)(4)- The building or structure grounding electrode system shall be used for grounding seperately derived systems. Level 3 trans.
Stairs from level 3 to 4 not complete nor is lighting for stairs. Will check with building inspector on this.
Final12/6/201812/7/201812/7/2018ANH
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Called contact, no answer, mail box full.
Must recall when available.
Electrical Rough-In11/30/201811/30/201811/30/2018PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Level 1 corridor grid rough in ok cover
Electrical Rough-In10/8/201810/9/201810/9/2018APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
South stairway all fished in, north stairway walls and hardlids rough in ok cover
Permanent Service9/27/20189/28/20189/28/2018APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
p/s u/g n ok
Electrical Rough-In9/13/20189/13/20189/13/2018PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Level 1 bathroom hardlids rough in ok cover
Electrical Rough-In9/11/20189/12/20189/11/2018APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 2nd and 4th floor restrooms Hard lids only ok to cover
Electrical Rough-In8/22/20188/22/20188/22/2018PPASS
DetailsRock A. Hudson
Bathrooms levels 1 and 4 wall rough in ok cover
Electrical Rough-In7/12/20187/12/20187/12/2018PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Levels 2, and 3 bathrooms walls and hard lids rough in ok cover
Electrical Rough-In7/2/20187/3/20187/3/2018APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed new permits needed for elevator. Electrical contractor has scope included in core and shell, elevator contractor will need seperate city and state permits.
Underground conduits for new gear in basement rough in ok cover.