Final | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Tom Saunders
|
|
|
After 2:00 if possible. Phone #: ###-#### Inspection requested via web by Alan Lusk...ok to final
|
Electrical Rough-In | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | PASS |
Tom Saunders
|
|
|
New Wall Phone #: ###-#### Inspection requested via web by Alan Lusk...ok to cover...new wall with 2 outlets and low volt switching for light
|
Electrical Rough-In | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Tom Saunders
|
|
|
Need approval to cover floor box in conference room. Phone #: ###-#### Inspection requested via web by Alan Lusk...ok to cover...per time constraints verified by pictures proper depth
|
Electrical Rough-In | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Mark Moncarr
|
|
|
Need ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Alan Lusk Ok cover ceilings throughout. Conduit for floor outlets to be installed sometime next week.
|
Electrical Rough-In | 7/12/2018 | 7/12/2018 | 7/12/2018 | P | PASS |
Tom Saunders
|
|
|
Inspect for wall cover. Phone #: ###-#### Inspection requested via web by Alan Lusk...wall cover only for 3 new offices...enter off east side building unit 140
|