Final | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Final ok
|
Final | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan 110.3- 4 receptacle outlets not working. 2 reception area, 1 knee space reception, 1 office old and crumbling. All not h
|
Final | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Duplicate request.
|
Electrical Rough-In | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Rock A. Hudson
|
|
|
Rough-in Ceiling Phone #: ###-#### Inspection requested via web by steve Grid rough in ok cover
|
Electrical Rough-In | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Ceiling Phone #: ###-#### Inspection requested via web by steve ragan 300.15- All cables shall terminate in a box. 12-2 mc stubbed out of wall in a office. 314 25- Several box covers missing through out. KO seals needed.
|
Electrical Rough-In | 7/19/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Discussed conference rm 7 receptacles minimum and 2 floor receptacles required, Wall rough in ok cover
|