Final | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Mark Moncarr
|
|
|
Brian Phone #: ###-#### Looked at job during initial inspection. Some conduits were moved after. Received pics of little work that was done. Conduits are stubbed up and covered for future shop location.
|
Conference | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | DONE |
Mark Moncarr
|
|
|
Call 25 mins ahead- Brian Phone #: ###-#### Discussed moving 3 in rigid sweep connected to pvc further W in trench to get closer to building.
|