Final | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Tom Saunders
|
|
|
Dylan...breaker verification; Phone #: ###-####...ok to final
|
Final | 7/18/2018 | 7/19/2018 | 7/19/2018 | P | NR |
Tom Saunders
|
|
|
Disconnect was moved from original location to new location. I didn''t realize the breaker in the panel was a 40 not 30, I have a replacement to install Thursday evening, I can send a photo when done if needed. Let me know if you need any more info, I will have spotty cell service most of the day so please leave a message. Phone #: ###-#### Inspection requested via web by Dylan Pierce...not ready at this time
|
Electrical Rough-In | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Tom Saunders
|
|
|
Disconnect was moved from original location to new location. I didn''t realize the breaker in the panel was a 40 not 30, I have a replacement to install Thursday evening, I can send a photo when done if needed. Let me know if you need any more info, I will have spotty cell service most of the day so please leave a message. Phone #: ###-#### Inspection requested via web by Dylan Pierce...bell box junction boxs used...W/P covers..piped on surface to new location of disconnect
|