Final | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Tom Saunders
|
|
|
As discussed in the previous rough-in inspection, I have completed the installation of the 220v, 15 amp electrical line for an outdoor AC condensing unit. Please call me (###-####) or Tona (###-####), 25 minutes before arriving. Phone #: ###-#### Inspection requested via web by Nicole Yogerst... fused disconnect with 15A fuses...ok to final
|
Electrical Rough-In | 8/12/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Tom Saunders
|
|
|
As discussed in the previous rough-in inspection, I have completed the installation of the 220v, 15 amp electrical line for an outdoor AC condensing unit. Please call me (###-####) or Tona (###-####), 25 minutes before arriving. Phone #: ###-#### Inspection requested via web by Nicole Yogerst... rough ok...sealtite to fused disconnect...14thhn used 15A circuit
|
Conference | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Tom Saunders
|
|
|
Hey Tom,
Brian and Dan, the mechanical and plumbing inspectors raised a question in relation to the electrical portion of the installation of a new AC stack in my condo. Would it be possible to ask you a few questions "on-site" before starting the project? Call me (###-####) or Tona (###-####) about 20 to 30 minutes before to be at home.
Thanks! Phone #: ###-#### Inspection requested via web by Nicole Yogerst...discussed location, disconnect, and material used to wire new A/C ...3' requirement infront of disconnect will be met but due to limited space a variance on 30" clearance side to side will be given
|