Final | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Eric Story
|
|
|
Final Entrance should be thru space door 230. Phone #: ###-#### Inspection requested via web by David Feller Card signed, final ok
|
Electrical Rough-In | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Mark Moncarr
|
|
|
New Wall Rough-in Suite 230 is entrance to space where work is. Phone #: ###-#### Inspection requested via web by David Feller Ok cover center wall dividing the 2 spaces. 2 recepts, and 1 switch.
|