Electrical Rough-In | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Mark Moncarr
|
|
|
wall cover inspection Phone #: ###-#### Inspection requested via web by Angela Stears Ok cover walls SW corner of building.
|
Electrical Rough-In | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Rock A. Hudson
|
|
|
open wall in show room Phone #: ###-#### Inspection requested via web by Angela Stears Eye glass display wall rough in ok cover
|
Electrical Rough-In | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Mark Moncarr
|
|
|
7 feet of concrete cover/floor electrical Phone #: ###-#### Inspection requested via web by Angela Stears Ok cover half wall and ground work on W side of building.
|
Electrical Rough-In | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Mark Moncarr
|
|
|
Rough and Cover Inspection Phone #: ###-#### Inspection requested via web by Angela Stears Ok cover. On previous inspection, a wall had been framed over top an outlet. Wall was moved, as outlet is going to be utilized.
|
Electrical Rough-In | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | NR |
Rock A. Hudson
|
|
|
###-#### New framed wall is directly over an outlet. I didnt know if outlet is deleted or if its going to be used. Previous correction was to allow panel to have working clearance. Work clearance 32w x 32 d, with stud covering receptacle in existing wall. Contractor unable to check out until monday 8-6-18 then will request inspection when ready.
|
Electrical Rough-In | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | CANC |
Mark Moncarr
|
|
|
ROUGH AND COVER INSP. Phone #: ###-#### Inspection requested via web by Angela Stears Re-scheduled for 8/3/18. Awaiting contractors phone call on newly moved wall overtop of outlet.
|
Electrical Rough-In | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Angela Stears 110.26A2. Width of working space in front of panel shall be 30in or greater. 110.12A Unused openings shall be closed. (Switch by door)
|