Electrical Rough-In | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
James Ady
|
|
|
Preferably in the morning. Quick rough-in inspection on phase 2 of our remodel. Insulation to go in as soon as we are given the go. Thank you! Phone #: ###-#### Inspection requested via web by James Pierce Kitchen and penninsula ok to cover
|
Conference | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | DONE |
James Ady
|
|
|
Talked to owner about AFCI protection of added receps in bedroom, GFCI protection of receps in laundry room and bath vanity, tamper resistant receps through out. Owners Dad is helping wire the addition and has previous electrical experience.
|
Electrical Rough-In | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by James Pierce Master bath, Reading room and laundry rooms only. Kitchen will be at a later date. Ok to cover
|