Final | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
James Ady
|
|
|
Homeowner should be home Phone #: ###-#### Inspection requested via web by aaron dill Final ok
|
Electrical Rough-In | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
James Ady
|
|
|
Floor heat // Erin Phone #: ###-#### Master floor heat ok to cover
|
Electrical Rough-In | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
James Ady
|
|
|
Homeowner should be there. Phone #: ###-#### Inspection requested via web by aaron dill Job was sheetrocked before inspection. Pictures were taken. Informed builder and Electrician permits were needed for all electrical and pluming installs. Rough in only ok
|