Final | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Eric Story
|
|
|
There is a key by the front step under the stucco sample. If you have questions please feel free to contact Fred ###-#### or Jason ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Final ok
|
Final | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | CANC |
Eric Story
|
|
|
Back door is open. If you have any questions please feel free to contact Fred ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Door locked
|
Rough-In Permanent Service | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
James Ady
|
|
|
It is open. If you have any questions, please call Tony at ###-####. Thank You Phone #: ###-#### Inspection requested via web by Clayton Morgan Check house UFER connection at final. UFER is directly behind House panel. (NEC 250.32) Garage and house. Rough in ok.. p/s o/h n ok
|
Electrical Rough-In | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | CANC |
James Ady
|
|
|
It is open. If you have any questions, please call Tony at ###-####. Thank You Phone #: ###-#### Inspection requested via web by Clayton Morgan
|
Electrical Rough-In | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | PASS |
Eric Story
|
|
|
This is for the underground. If you have any questions please feel free to contact Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan U/G from to garage to house ok to cover
|