Electrical Rough-In | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Eric Story
|
|
|
Brian Prussia, tech: ###-####
Phone #: ###-#### Inspection requested via web by BRS Permitting All Solar array materials are listed and verified scope of work
|
Final | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Eric Story
|
|
|
Brian Prussia, tech: ###-####
Phone #: ###-#### Inspection requested via web by BRS Permitting Solar array final ok
|
Final | 8/8/2018 | 8/9/2018 | 8/9/2018 | P | CANC |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
Electrical Rough-In | 8/6/2018 | 8/8/2018 | 8/8/2018 | A | NH |
Daryl DeGrange
|
|
|
Brian Prussia, tech: ###-####
Phone #: ###-#### Inspection requested via web by BRS Permitting No Access, Jobs already completed prior to rough-in inspection. No technician on site.
|
Final | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | CANC |
James Ady
|
|
|
Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|