Final | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Eric Story
|
|
|
entry gate code 2663 crew working on back deck will be there can get you access to garage Phone #: ###-#### Inspection requested via web by dennis mcneely Final ok
|
Final | 4/5/2019 | 4/5/2019 | 4/5/2019 | P | FAIL |
Eric Story
|
|
|
will have to meet you for access, owners are out of town, so if can give me heads up, thanks Phone #: ###-#### Inspection requested via web by dennis mcneely 210.12 All devices in bedroom shall have AFCI protection(master bed out soffit cans are non AFCI protected)
|
Electrical Rough-In | 9/21/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Eric Story
|
|
|
cover of floor heat in bathroom Phone #: ###-#### Inspection requested via web by dennis mcneely Floor heat ok to cover
|
Electrical Rough-In | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | CANC |
Eric Story
|
|
|
installing floor heat in bathroom need cover inspect Phone #: ###-#### >> Inspection requested via web by dennis mcneely Inspection cancelled from web by: dennis mcneely
|
Electrical Rough-In | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Eric Story
|
|
|
Access code is 2663 Garage ok to cover
|
Electrical Rough-In | 8/6/2018 | 8/7/2018 | 8/7/2018 | P | CANC |
Eric Story
|
|
|
ready for cvr in garage Phone #: ###-#### Inspection requested via web by dennis mcneely Will re-schedule for first thing in morning due to no access code at time of arrival
|
Electrical Rough-In | 8/1/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Eric Story
|
|
|
need cover 4master suite area and soffit exterior lights Phone #: ###-#### Inspection requested via web by dennis mcneely Master and bath and back soffit ok to cover
|