Final | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PASS |
Eric Story
|
|
|
as early as possible // Diana Phone #: ###-#### Basement craft room only ok to cover
|
Final | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | CANC |
Eric Story
|
|
|
as late as possible // Diane Phone #: ###-####
|
Final | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | CANC |
Eric Story
|
|
|
Talked with Bill to get re- inspected // Diana Phone #: ###-#### Needed conference at this time
|
Conference | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | DONE |
Eric Story
|
|
|
Talked with Bill to get re- inspected // Diana Phone #: ###-#### Discussed wiring in basement craft room/laundry room and adding a dedicated 20 amp circuit and wall spacing requirements. wall with sheetrock removed as per DD is ok to cover
|
Electrical Rough-In | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | NR |
Daryl DeGrange
|
|
|
Dianna Phone #: ###-#### Not ready for rough-in at this time
|
Conference | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | DONE |
Daryl DeGrange
|
|
|
Dianna Phone #: ###-#### Discuss with homeowner electrical requirements for remodel of ultitiy/craft room in basement. work has been already started and partial covered. Asked for all covered wiring to be exposed.
|